Vineyard and orchard development and agricultural grading shall be set back from wetlands
in compliance with the requirements in Table 36-7, unless a greater setback is required
by the general plan, local coastal plan, or zoning code. Setback areas for wetlands
shall be managed in compliance with the wetland delineation study or wetland assessment,
as applicable, and the department's best management practices for agricultural erosion
and sediment control. The setback requirements in this section shall not apply where
all necessary state and federal permits, approvals, or authorizations to fill the
wetlands are obtained, or the vineyard or orchard development or agricultural grading
is exempt from such requirements.
Table 36-7 - Wetland Setback Requirements
Type of Wetland
Setback
Wetland designated in the zoning code
100 feet from the delineated wetland boundary
All other wetlands
50 feet from the assessed wetland boundary, unless the wetland assessment recommends
a different setback
(Ord. No.
6219
, § II(Exh. B), 12-19-2017)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');