§ 26-34-030. Building intensity and development criteria.


Latest version.
  • The use of land and structures within this district is subject to this article, the applicable regulations of this chapter, and the provisions of any district which is combined herewith. Policies and criteria of the general plan and any applicable specific or area plan or local area development guidelines shall supersede the standards herein.

    (a)

    Building Intensity. The maximum building intensity of the use of a site shall be determined by multiplying the maximum building height limit and the maximum coverage of the lot in square feet. The specified height or lot coverage limits may be modified if a use permit is first secured and if the maximum building intensity is not exceeded.

    (b)

    Maximum Building Height.

    (1)

    Thirty-five feet (35′) provided, however, that the additional height may be permitted subject to subsection (a) of this section.

    (2)

    Maximum height for telecommunication facilities is subject to the provisions of this article and Section 26-88-130.

    (c)

    Minimum Lot Size. Eight thousand (8,000) square feet.

    (d)

    Maximum Lot Coverage. Fifty percent (50%) provided that additional coverage may be permitted subject to subsection (a) of this section.

    (e)

    Yard Requirements. The minimum yard requirements in a C3 district shall be the same as in an LC district; provided, however, that a greater setback may be established for properties abutting certain roads classified as collector or arterial in Sections CT-4.4 and CT-4.5 of the general plan or to accommodate any landscaping required pursuant to subsection (g) of this section. If the subject property adjoins land which is zoned AR or is designated as agricultural land, the use is subject to the requirements of Section 26-88-040(g).

    (f)

    Parking and Loading Spaces. The parking and loading space requirements shall conform to the provisions of Article 86 of this chapter.

    (g)

    Design Review. Design review approval shall be required for all uses in the manner provided in Article 82.

(Ord. No. 4973 § 9(d), 1996; Ord. No. 4643, 1993.)