§ 7-5. Building permit required.  


Latest version.
  • (a)

    No person, firm or corporation shall erect, construct, enlarge, alter, repair, move, improve, convert or demolish any building or structure in the unincorporated area of this county, or cause the same to be done, without first obtaining a separate building permit for each such building or structure as required by this chapter. Permits shall be issued and fees shall be collected by the permit and resource management department. The building standards for the work authorized by the new permit shall be governed by the codes in force at the time of the new permit application as described in Chapter 1, Division I, of the California Building Code as to the erection and construction of dwellings and appurtenant structures for which construction was lawfully commenced, commenced to legalize a violation, or approved prior to the effective date of this ordinance.

    (b)

    Permits shall not be issued by the permit and resource management department for work which includes any of the following, unless and until written approval has been received:

    (1)

    The construction, alteration or modification of:

    (i)

    Any on-site disposal system (approval required from the well and septic section of permit and resource management department),

    (ii)

    Any water supply system which under state law or county ordinance is required to have a permit to operate (approval required from the health officer or the state health services department),

    (iii)

    Any establishment selling or preparing food or food products, any public or semi-public swimming pool as defined in the 2013 California Administrative Code (approval required from the health officer);

    (2)

    The construction, alteration or modification of any structure which will result in the structure being connected to an on-site wastewater disposal system or water system; (approval required from the well and septic section of permit and resource management department),

    (3)

    The alteration or modification of any existing structure which is connected to an on-site wastewater disposal system or water system requiring a permit, where the alteration or modification may impose additional burdens upon the existing system, such as, but not limited to, the addition of rooms or the modification of floor plans for potential additional occupancy. This section shall not apply to repairs, such as replacement of roofing or siding. Where the permit is for modification or alteration of an existing structure, no permit will be issued where, in the determination of the chief building official, such modification is likely to result in exceeding the capacity of the system;

    (4)

    The construction, alteration or modification of any structure which may result in the property being improved in excess of its capacity to absorb sewage effluent. This section is intended to cover any change in the property which might adversely affect sewage disposal such as, but not limited to, grading or the construction of a barn or swimming pool which might infringe on the leach field (approval required from the well and septic section of permit and resource management department);

    (5)

    For the purposes of this section, approval by the well and septic section of permit and resource management department shall mean either an office clearance, field clearance, or issued well and septic permit for on-site wastewater disposal system.

    (c)

    Whenever approval of the on-site wastewater disposal system is required, it shall be based upon the requirements imposed by this chapter and any other state or local law or regulation which may be applicable, including basin plans and other standards promulgated by the North Coast Water Quality Control Board and the San Francisco Bay Regional Water Quality Control Board.

    (d)

    Building permits must be cleared as to zoning considerations in Chapters 26 or 26C, grading and drainage requirements in Chapter 11, and stormwater requirements in Chapter 11A of this Code. Building permits for projects regulated by the California Fire Code and Sonoma County fire safe standards may be subject to review and approval by appropriate fire service agencies. Where county road encroachment is necessary, a permit for same shall be first secured. A water and/or sewer clearance is first required in areas serviced by special districts and cities before building permits can be issued.

    (e)

    Notwithstanding any other provision of this chapter or the codes adopted hereby, emergency maintenance work or repair of buildings and structures requiring a permit hereunder may be commenced before obtaining a permit without violating this chapter provided the permit and resource management department or the public health officer, in the appropriate case, is notified prior to noon of the next following business day and the permit required is obtained within twenty-four (24) hours thereafter, and provided further that no work shall be covered before it has been duly inspected and approved. Compliance with the State Subdivision Map Act, the Sonoma County subdivision regulations, and the Sonoma County zoning regulations, including compliance with conditional permits issued thereunder, and compliance with all laws, is a condition precedent to the issuance of any permit required by this chapter for work to be done on any particular parcel of real property in the unincorporated area of this county.

    (f)

    As a condition precedent to the issuance of a building permit required by this section for which an application was made on or after November, 1989, the applicant shall pay to the county development fee as specified in Section 26-98-660 of this Code. The permit required for Section 105 of Appendix 1 of the California Building Code for structures subject to the requirements of this subsection shall not be issued unless and until the development fee has been paid.

    (g)

    Within flood-prone urban areas as defined in Section 7-13(a)(10), a building permit authorizing excavation for foundations shall not be issued until a disposal location for excavated material has been designated. Acquisition of a building permit does not relieve the permittee of the responsibility for acquiring any other state and local permits required for the activity.

    (h)

    In any unincorporated portion of Sonoma County where stormwater discharges are subject to the requirements of one or more NPDES permits, as referenced in Chapter 11, any construction site for which building permits are approved pursuant to Chapter 7 must be developed and used pursuant to any applicable requirements of said NPDES permit(s). Failure to adhere to applicable NPDES permit requirements at any time will be deemed to be a violation of this section and may subject the permittee to the penalties established by this chapter. Permittees may meet this requirement by filing with the Regional Water Quality Control Board the appropriate notice of intent to comply with the state general construction activity stormwater permit or by obtaining approval of an individual NPDES permit from the Regional Water Quality Control Board.

(Ord. No. 6048, § I(a), 11-5-2013; Ord. No. 5904, § I, 11-2-2010; Ord. No. 5891, § 2, 12-9-2008; Ord. No. 5754, § 1(e), 2007; Ord. No. 5167, §§ 1(b), 1(c), 1999; Ord. 4981, §§ 1, 2, 1996; Ord. No. 4906, § 3 (part), 1995.)