Sonoma County |
Code of Ordinances |
Chapter 25. SUBDIVISIONS |
Article III. Tentative and Final Map Procedures. |
§ 25-29. Contents.
Every tentative map shall be clearly and legibly drawn to scale and shall contain the following information:
(a)
A site location sketch indicating the location of the proposed subdivision in relation to the surrounding area or region;
(b)
The tract name, if any, date, north point, scale and sufficient description to define the location and boundaries of the proposed tract;
(c)
Names and addresses of record owner, subdivider, engineer or surveyor;
(d)
Location, names and present width of adjacent or abutting roads, streets, highways and ways and their status as public or private roads;
(e)
The location, names, widths and approximate gradient of all roads, streets, highways and ways in or adjacent to the proposed subdivisions, or to be offered for dedication;
(f)
Any portion of a site over fifty percent (50%) grade shall not be considered buildable. Development areas and roadways proposed on slopes in excess of ten percent (10%) shall require civil engineer prepared grading plans.
Base map of the site (defined as the project boundaries or general development area) and all adjoining properties within two hundred feet (200′) of the site at a scale and contour interval appropriate to clearly ascertain the topographical characteristics of the site and showing slope bands in the ranges of one percent (1%) to ten percent (10%); ten percent (10%) to fifty percent (50%); fifty percent (50%) and greater, shall be prepared. Said maps shall be prepared by a registered civil engineer or licensed land surveyor and methods of slope determination indicated;
(g)
The approximate width and location of all proposed or existing easements for drainage, sewerage for public utilities;
(h)
The approximate dimensions of all lots, and radii of all curves;
(i)
Lot numbers.
(Ord. No. 2510 § 13; Ord. No. 965 § 3.)